Manufacturing FAQ

Answers to common questions about drawings, materials, prototype decisions and repeat orders.

Drawings and quotes

What files should I send for a quote?

Send a STEP or IGES model and the dimensioned drawing at the same revision. Include material, finish, requested quantity, target date and any inspection or documentation needs.

Can I start with only a 3D model?

Yes, for preliminary review. Add a drawing if material, threads, independent tolerances, finishes or inspection criteria determine acceptance.

What makes two quotes comparable?

Make sure the same quantity, finish, shipping scope, inspection evidence and acceptance condition are included in both quotes. Separate any tooling or approved sample cost.

What is useful when choosing between processes?

State the next design decision and identify the geometry, grade, finish and material behavior that must be reproduced for that decision to be valid.

Materials and inspection

Can an equivalent material be considered?

Identify the exact grade requirement and separate it from the properties driving the choice. Provide temperature, corrosion conditions, loads and mating surfaces if equivalents can be evaluated.

What tolerance should I put on the drawing?

Specify feature-level requirements for the interfaces that control fits, alignment and sealing. Provide the reference framework and acceptance condition for features measured after finishing.

How do I specify a cosmetic surface?

Mark the visible faces and share a finish or color reference. Indicate allowed marks, brushing direction and whether adjacent parts must be compared under agreed lighting.

What inspection records should I ask for?

Identify dimensions, reports, sampling or lot records you actually need. A first-sample record can differ from recurring inspection on repeat orders.

Samples and production

Can a prototype serve as the approval sample?

Use it when it represents the material, geometry, finish and process variables the approval depends on. Document differences and use a pilot sample for any questions driven by the production route.

How do I release a revised part?

Send the updated model and drawing together. Identify changed features, affected orders and whether earlier approvals still apply to unchanged features.

What should be included in a reorder?

Reference the approved model and drawing, previous order or sample, quantity, target delivery and any changes to packaging, inspection or finish.

Share your specific question with the drawing

Tell us what the part does and what you need to confirm so we can review the right features.

Scroll to Top